NVE's AD024-00E GMR Switch integrates GMR sensor elements with digital onboard
signal processing electronics. The GMR Switch has less field sensing errors than
other magnetic sensors, and magnetic field operate points are stable over voltage
and temperature extremes. This enables high precision, tight-tolerance magnetic
sensing assemblies.
Features:
Precision Magnetic Operate Point -- 28 Oersteds
Excellent Temperature and Voltage Performance
Digital Outputs
Frequency Response 0 to 250 KHz
Small, Low Profile Surface Mount Packages
Applications:
General Digital Field Sensing
Pneumatic Cylinder Position Sensing
Speed Sensing
Supply
Voltage
min.-max.
Supply
Current
(mA)
min.-max.
Op. Point
(Oe)
min.-max.
Differ-
ential
(Oe)
min.
Output
Sat.
Voltage
max.
Output
Pkg. Mark
Orien-
tation
Pkg.
4.5-30.0
2.5-4.5
21-34
5
0.4
Current Sink
BBF
Cross axis
MSOP8 (RoHS)
Note: Parts must be purchased in tube quantities (multiples of 100) for quantities of 100 or more. Larger quantities are subject to NVE's standard lead times.
This part is RoHS compliant.
NVE's AD024-10 GMR Switch integrates GMR sensor elements with digital onboard
signal processing electronics. The GMR Switch has less field sensing errors than
other magnetic sensors, and magnetic field operate points are stable over voltage
and temperature extremes. This enables high precision, tight-tolerance magnetic
sensing assemblies.
Features:
Ultra-miniature 2.5 mm x 2.5 mm TDFN Package
Precision Magnetic Operate Point -- 28 Oersteds
Excellent Temperature and Voltage Performance
Digital Outputs
Frequency Response 0 to 250 KHz
Applications:
General Digital Field Sensing
Pneumatic Cylinder Position Sensing
Speed Sensing
Supply
Voltage
min.-max.
Supply
Current
(mA)
min.-max.
Op. Point
(Oe)
min.-max.
Differ-
ential
(Oe)
min.
Output
Sat.
Voltage
max.
Output
Pkg. Mark
Orien-
tation
Pkg.
4.5-30.0
2.5-4.5
21-34
5
0.4
Current Sink
BBL
Cross axis
TDFN6 (RoHS)
Note: Parts must be purchased in multiples of 100 for quantities of 100 or more. Larger quantities are subject to NVE's standard lead times.